Slide 1: Executive Summary

Why This Matters

MuleSoft Agent Fabric automates critical operations across:

  • SAP, Oracle Fusion, ServiceNow
  • Industrial IoT/SCADA systems
  • Financial systems and asset management

The Risk: New AI-powered attack surfaces

  • Rogue agents infiltrating the network
  • AI hallucinations causing unsafe operations
  • Gradual drift toward dangerous operating conditions

The Solution: Comprehensive Red Team/Blue Team validation

  • 27 attack scenarios tested
  • Phased deployment following OT best practices
  • Human-in-loop for safety-critical decisions

Slide 2: The Threat Landscape

STRIDE Threat Model for AI Agents

Threat Category Example Attack Business Impact
Spoofing Rogue agent registration Unauthorized system access, data theft
Tampering Prompt injection, sensor poisoning Unsafe operations, process failures
Repudiation Unlogged agent decisions No audit trail, compliance violations
Information Disclosure Excess AI permissions Financial data leakage, IP theft
Denial of Service Agent flooding, recursion loops System downtime, lost productivity
Elevation of Privilege Cross-system overreach Cascading failures across SAP/SCADA

Real-World Context (InfraGard November 2025):

  • First fully-automated AI attack documented (Anthropic)
  • Polymorphic attacks bypassing ML detection
  • Normalization of deviance in OT environments

Slide 3: What We're Testing

Target System Architecture

13 AI Agents Across 3 Applications

Application 1: Agentic Orchestration (Real AI)

  • Azure ML Agent (SCADA anomaly detection)
  • Work Order Optimizer (MCP-enhanced, 95% confidence)
  • ServiceNow Agent (work order automation)

Application 2: Turnaround Management

  • Planning, Procurement, Workforce, Finance Agents
  • $16M+ annual value through intelligent prioritization

Application 3: Order-to-Cash

  • Order, Inventory, Asset Health, Logistics, Billing Agents
  • 82% asset utilization, $16.4M/year value

All deployed on CloudHub 2.0, production-ready


Slide 4: Testing Approach - Not Your Typical Pen Test

Phased Deployment (InfraGard OT Best Practice)

"Skip stage gates at your peril - OT failures have consequences IT teams rarely face" — Marco Ayala, InfraGard Houston AI-CSC

5 Phases (12 Weeks)

Week 1-2:  Lab Environment
           ↓ Gate 1: Security scan, peer review
Week 3-4:  Hardware in Loop (Test against real endpoints)
           ↓ Gate 2: Red Team Phase 2, rollback tested
Week 5-6:  Shadow Mode (Parallel with production, observe only)
           ↓ Gate 3: 30+ days success, kill-switch tested
Week 7-8:  Limited Production (Non-critical only)
           ↓ Gate 4: 60+ days success, cross-functional sign-off
Week 9-12: Full Deployment (Continuous monitoring)

Cannot skip gates - Each phase has strict entry/exit criteria


Slide 5: Human-in-Loop Requirements

When Does AI Need Human Approval?

"Human in the loop as decision maker is MANDATORY for safety-critical systems" — Marco Ayala

Decision Type Auto-Approve? Human Required? Timeout
P0 Work Order (> $50K) ❌ NO ✅ Operations Mgr 15 min
Safety Procedure Changes ❌ NO ✅ Safety Manager IMMEDIATE
SCADA Setpoint Changes ❌ NO ✅ Process Engineer IMMEDIATE
Emergency Shutdown ⚠️ Auto if life/safety ✅ Verify in 30s 30 sec
Budget Approval (> $100K) ❌ NO ✅ Finance Director 1 hour
Routine Maintenance (< $5K) ✅ YES ❌ NO N/A

Safety First: AI provides recommendations, humans make critical decisions


Slide 6: The 27 Test Scenarios

Original 20 Scenarios (Base Specification)

Spoofing (3 scenarios)

  • Rogue agent registration, MCP replay attacks

Tampering (11 scenarios)

  • Prompt injection, sensor poisoning, context corruption
  • SAP/SNOW contamination, social engineering

Information Disclosure (1 scenario)

  • Unauthorized financial data access

Denial of Service (2 scenarios)

  • Orchestration flooding, A2A recursion loops

Elevation of Privilege (3 scenarios)

  • Unauthorized A2A escalation, tool overreach

Slide 7: NEW Test Scenarios (InfraGard-Derived)

7 Additional Scenarios from November 2025 Session

RT-021: Polymorphic Attack

Threat: AI-generated attack variations bypass pattern detection Source: Andrew's presentation on adversarial attacks Defense: Behavior-based detection, not signatures

RT-022: LLM Hallucination Injection

Threat: AI generates false safety procedures Source: OWASP Top 10 for LLMs Defense: MCP Safety Server cross-validation

RT-023: Data Poisoning

Threat: Corrupt AI training data via MCP context Source: Integrity attacks discussion Defense: Cryptographic hashing, immutable logs

RT-024: Normalization of Deviance

Threat: Gradually shift safety baselines to unsafe levels Source: Marco's specific warning about OT drift Defense: Drift detection, periodic baseline reset


Slide 8: Success Criteria - How Do We Know It Works?

Security Metrics (IT Focus)

Metric Target Why It Matters
Detection Latency < 3s Rapid threat response
Block Accuracy ≥ 99% Effective threat prevention
False Positive Rate < 3% Minimize operational disruption
Lineage Traceability 100% Complete audit trail
Recovery Time < 60s Minimize downtime

Safety Metrics (OT Focus)

Metric Target Why It Matters
Safety Incidents 0 Zero harm to people/assets
Unsafe Recommendations Blocked 100% Prevent process failures
Human Approval Compliance 100% Governance enforcement
Kill-Switch Activation < 1s Emergency protection

Slide 9: What Could Go Wrong? (Risk Analysis)

High-Risk Scenarios & Mitigations

Risk 1: AI Recommends Unsafe SCADA Operation

Likelihood: Medium | Impact: CRITICAL Mitigation:

  • MCP Safety Server validates ALL recommendations
  • Hard limits AI cannot override
  • Human approval MANDATORY for setpoint changes
  • Kill-switch tested quarterly

Risk 2: Gradual Drift to Unsafe Baselines

Likelihood: High | Impact: HIGH Mitigation:

  • Daily drift monitoring vs. engineering baseline
  • Alert when drift > 5%
  • Monthly baseline reset to factory settings
  • Independent process safety audits

Risk 3: Rogue Agent Infiltration

Likelihood: Medium | Impact: HIGH Mitigation:

  • MCP identity enforcement (no anonymous agents)
  • Agent registry whitelist
  • Real-time anomaly detection
  • Immediate isolation of unauthorized agents

Slide 10: Investment Required

Resources & Budget

Team (12 Weeks)

Role Allocation Cost
OT Lead (Process Safety Engineer) 50% $60K
IT Lead (Security Architect) 50% $60K
Business (Operations Manager) 25% $30K
Legal/Compliance 10% $12K
Red Team (External) 2 weeks $80K
Total Labor $242K

Tools & Infrastructure

Item Cost
CloudHub 2.0 (Test Environment) $15K
SIEM/Monitoring (Splunk/ELK) $25K
Security Tools (OWASP ZAP, etc.) $10K
Total Tools $50K

Total Investment: $292K


Slide 11: Return on Investment (ROI)

Value Delivered

Risk Mitigation (Avoid Costs)

  • Prevent Safety Incident: $10M+ (avg. refinery incident cost)
  • Prevent Data Breach: $4.5M (IBM 2024 avg.)
  • Prevent System Downtime: $500K/day (refinery downtime)
  • Avoid Regulatory Fines: $1M+ (OSHA/EPA violations)

Total Risk Avoided: $16M+

Operational Benefits (Create Value)

  • AI-Powered Prioritization: $10M+ annual value (repo claims)
  • Asset Intelligence: $16.4M/year value (82% utilization)
  • Cost Optimization: $385K savings (turnaround mgmt)
  • Automation Efficiency: 90% reduction in detection time

Total Value Created: $26.8M+

ROI: 9,000%+ ($292K investment → $42M+ value)


Slide 12: Timeline & Milestones

90-Day Critical Path

Week 1-2:  Foundation
           ✓ Form cross-functional team
           ✓ Join InfraGard for threat intelligence
           ✓ Deploy lab environment

Week 3-4:  Baseline Testing
           ✓ Execute Red Team Phase 1 (RT-001 to RT-010)
           ✓ Establish Blue Team detection baselines
           ✓ Measure TTD, block accuracy

Week 5-6:  Shadow Pilot
           ✓ All 27 scenarios tested
           ✓ Polymorphic attack testing
           ✓ Human-in-loop workflows validated

Week 7-8:  Limited Production
           ✓ Non-critical agents only
           ✓ Kill-switch tested
           ✓ Incident response drills

Week 9-12: Validation & Go/No-Go
           ✓ 30+ days production data
           ✓ Success criteria validated
           ✓ Executive decision: GO or NO-GO

Key Decision Point: Day 90 - Proceed to Full Deployment?


Slide 13: Governance & Oversight

Who's Accountable?

Executive Sponsor

Role: CISO or CIO Responsibilities:

  • Final GO/NO-GO decision authority
  • Budget approval and resource allocation
  • Escalation point for critical safety violations

Steering Committee (Weekly Meetings)

  • OT Lead: Process safety compliance
  • IT Lead: Cybersecurity controls
  • Business: Operational impact assessment
  • Legal: Regulatory compliance, risk ownership

Technical Working Group (Daily Standups)

  • Red Team: Attack execution
  • Blue Team: Detection and response
  • DevOps: Environment management
  • QA: Test validation

External Oversight

  • InfraGard: Threat intelligence integration
  • 3rd Party Auditor: Annual penetration testing
  • Standards Bodies: ISA/IEC 62443, OWASP participation

Slide 14: Framework Compliance

Alignment with Industry Standards

NIST AI Risk Management Framework

GOVERN: AI governance, executive ownership ✅ MAP: Risk categorization, use case mapping ✅ MEASURE: Drift detection, performance metrics ✅ MANAGE: Human oversight, incident response

OWASP Top 10 for LLMs

LLM01: Prompt Injection → RT-003, RT-018, RT-022 ✅ LLM02: Insecure Output → RT-017 (safety validation) ✅ LLM03: Training Data Poisoning → RT-023 ✅ LLM04: Model DoS → RT-008, RT-009 ✅ LLM08: Excessive Agency → RT-002, RT-006, RT-011

ISA/IEC 62443 (Industrial Control Systems)

Security Level 3: Critical agents (Azure ML, Safety MCP) ✅ Defense in Depth: Multi-layer security controls ✅ Secure Development: Stage gate enforcement


Slide 15: Key Insights from InfraGard Session

Lessons from Industry Experts

Marco Ayala (National Energy Sector Chief)

"Skip stage gates at your peril - OT failures have consequences IT teams rarely face"

Takeaway: Follow phased deployment rigorously

"Human in the loop is MANDATORY for safety-critical systems"

Takeaway: AI recommends, humans decide on safety

"Normalization of deviance - when nothing bad happens, we accept it as new normal"

Takeaway: Implement drift detection and periodic resets

Andrew (IT Section Lead)

"Polymorphic attacks designed to bypass pattern detection"

Takeaway: Use behavior-based, not signature-based detection

"Superman effect - logged in Houston, 15 min later in Tokyo"

Takeaway: Geo-location validation for credential theft


Slide 16: Competitive Advantage

Why This Sets Us Apart

Most Organizations

❌ Deploy AI without security testing ❌ Skip phased validation ("move fast, break things") ❌ No human-in-loop for critical decisions ❌ Reactive security (wait for incidents)

Our Approach

Proactive Red Team/Blue Team validationPhased deployment with stage gatesHuman-in-loop governanceContinuous threat intelligence (InfraGard)Industry framework alignment (NIST, OWASP, ISA)

The Result

  • Industry-leading security posture
  • Regulatory compliance confidence
  • Insurance premium reduction potential
  • Customer/partner trust enhancement
  • Recruitment advantage (top talent wants secure systems)

Slide 17: What We're NOT Testing (Scope Boundaries)

Out of Scope

Model Weights

  • Internal LLM training parameters
  • Rationale: Using Azure OpenAI (Microsoft's responsibility)

Non-MuleSoft Cloud Infrastructure

  • AWS, Azure core services
  • Rationale: Covered by cloud provider security

Physical SCADA Hardware

  • Actual refinery equipment
  • Rationale: Testing uses simulators and shadow mode

Destructive Operational Testing

  • Intentional process shutdowns
  • Rationale: Safety first - no production impact allowed

Live Production Data

  • Real customer information
  • Rationale: Using synthetic test data only

Scope: MuleSoft Agent Fabric, A2A protocol, MCP servers, CloudHub integrations


Slide 18: Dependencies & Assumptions

What We Need to Succeed

Critical Dependencies

  1. CloudHub 2.0 Access: Test environment with production parity
  2. InfraGard Membership: All team members enrolled
  3. SIEM Integration: Anypoint Monitoring + Splunk/ELK
  4. Cross-Functional Team: OT, IT, business, legal availability
  5. Vendor Support: MuleSoft TAM for technical escalations

Key Assumptions

  1. Production agents remain stable during testing period
  2. Azure OpenAI API availability (99.9% SLA)
  3. No major regulatory changes mid-project
  4. Budget approved for full 12-week period
  5. Executive sponsor remains engaged

Risk Mitigations

  • Dependency failure: Escalation to steering committee within 24 hours
  • Assumption invalidated: Re-assess GO/NO-GO criteria

Slide 19: Communication Plan

Keeping Stakeholders Informed

Executive Dashboard (Weekly)

Audience: CISO, CIO, COO Format: PowerBI dashboard Metrics:

  • Tests passed/failed
  • Critical findings
  • Budget vs. actual
  • Schedule status (Green/Yellow/Red)

Steering Committee Report (Weekly)

Audience: Cross-functional leads Format: 30-min meeting + written report Content:

  • Previous week accomplishments
  • Current week plan
  • Blockers/risks
  • Decisions needed

Technical Working Group (Daily)

Audience: Red Team, Blue Team, DevOps Format: 15-min standup Content:

  • Yesterday's results
  • Today's tests
  • Immediate blockers

Board of Directors (Quarterly)

Audience: Board, C-Suite Format: 10-min executive summary Focus: Risk mitigation, ROI, compliance


Slide 20: Decision Required Today

What We're Asking For

Approval to Proceed

Budget: $292K over 12 weeks ✅ Resources: 2.35 FTE cross-functional team ✅ Timeline: Start Week 1 immediately ✅ Authority: CISO/CIO as executive sponsor

Immediate Next Steps (Day 1)

  1. Sign contract with external Red Team firm
  2. Form working group - assign OT, IT, business, legal leads
  3. InfraGard enrollment - all team members
  4. Kickoff meeting - Friday, all stakeholders

Alternatives Considered

Do Nothing: Risk catastrophic failure, $10M+ incident cost ❌ Partial Testing: Skip phases → "normalization of deviance" ❌ Delay 6 Months: Agents accumulate risk, harder to retrofit

Recommendation: APPROVE and start immediately


Slide 21: Questions & Discussion

Open Forum

Anticipated Questions

Q: Why 12 weeks? Can we accelerate? A: InfraGard OT best practice - skipping stage gates creates safety risk. Each phase validates the previous.

Q: What if we fail the GO/NO-GO decision at Day 90? A: Return to shadow mode, address gaps, re-test. Better to find issues now than in production.

Q: Can we use internal resources instead of external Red Team? A: Possible, but external perspective catches blind spots. Recommend hybrid approach.

Q: What happens after full deployment? A: Continuous monitoring, quarterly Red Team exercises, annual 3rd party pen test.

Q: How does this compare to traditional pen testing? A: Traditional = network/app layer. This = AI-specific threats (hallucinations, drift, agent spoofing).


Slide 22: Appendix - Technical Details

For Deep Dive (If Requested)

Test Scenario Examples

  • RT-003: Prompt Injection Attack
  • RT-024: Normalization of Deviance
  • RT-022: LLM Hallucination Injection

Architecture Diagrams

  • Agent Fabric with 13 agents
  • MCP Server integration
  • A2A communication flow

Sample Blue Team Playbook

  • Detection → Analysis → Response → Recovery

Monitoring Dashboard Mockups

  • Executive view (CISO)
  • Operations view (Process Safety)

Automated Test Script (Python)

  • 27 scenarios
  • InfraGard threat intel integration

Slide 23: Contact Information

Project Team

Executive Sponsor

Name: [CISO/CIO Name] Email: [email] Phone: [phone]

Program Manager

Name: [PM Name] Email: [email] Role: Day-to-day coordination, status reporting

Technical Leads

OT Lead: [Process Safety Engineer] IT Lead: [Security Architect]

External Partners

InfraGard Houston: AI-CSC Monthly Meetings MuleSoft TAM: [Technical Account Manager] Red Team Firm: [Vendor Name]


Slide 24: Call to Action

Next Steps

Today's Decision

APPROVE $292K budget and 12-week timeline

This Week

  1. Assign executive sponsor (CISO/CIO)
  2. Form cross-functional working group
  3. Contract external Red Team
  4. Schedule kickoff meeting

Week 1 (Starting Monday)

  1. All team members join InfraGard
  2. Deploy lab environment
  3. Baseline current security posture
  4. Document test plan

Day 90

GO/NO-GO Decision based on success criteria


Thank You

Questions?

Prepared By: Red Team / Blue Team Working Group Date: November 15, 2025 Version: 2.0 (InfraGard Enhanced)

InfraGard Session: November 2025 Houston AI-CSC Presenters: Marco Ayala, Andrew


Status: ✅ READY FOR EXECUTIVE REVIEW