chore(deps): bump actions/setup-node from 4 to 5 #2169
tests.yml
on: pull_request
detect-changes
5s
documentation-site
22s
Matrix: test-golang
Annotations
3 errors
|
test-golang (macos-latest)
Process completed with exit code 1.
|
|
test-golang (ubuntu-latest)
The operation was canceled.
|
|
test-golang (ubuntu-latest)
The strategy configuration was canceled because "test-golang.macos-latest" failed
|